View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Engineering Failure Scenario Analysis | ![]() Systems Thinking Systems Mapping | ![]() Systems Thinking Intervention Mapping | ![]() Decision Making Pre-Mortem |
|---|---|---|---|---|
Purposedifferent | In critical processes, it is not enough to plan only for the normal case. Failure Scenario Analysis looks at the path into failure and shows which failures, chains, and control gaps cause the most damage. | Systems Mapping arranges elements, relationships, and boundaries so a complex field becomes legible at a glance. The overview stabilizes the overall picture before detail work or steering begins. | Intervention Mapping translates a need for change into a planned, evaluable program. The method connects target group, determinants, actions, and measurement into a traceable chain. | In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures. |
Complexitydifferent | Medium | Medium | High | Low |
Timedifferent | 1-3 h | 1-3 h | 1-5 Tage | 20–45 min |
Participantsdifferent | 3-8 | 3-12 | 4-12 | Small cross-functional group |
Formatdifferent | Workshop | Workshop + async | Workshop + async | Workshop |
Outputdifferent | Failure Scenarios, Risk Notes, Control Gaps, Test and Response Actions | System Map, Dependencies, Leverage Points | Logic Model, Change Objectives, Intervention Components, Evaluation Plan | Risk list, Mitigation plan, Assumption log |
Tagsno overlap | FailureResilienceRisk | Systems thinkingMappingBoundariesChange | ChangeSystems thinkingCapability | RiskDecisionFailurePlanning |



