View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Engineering Failure Scenario Analysis | ![]() Decision Making Risk Matrix | ![]() Business Strategy Business Model Stress Test | ![]() Decision Making Assumption Surfacing |
|---|---|---|---|---|
Purposedifferent | In critical processes, it is not enough to plan only for the normal case. Failure Scenario Analysis looks at the path into failure and shows which failures, chains, and control gaps cause the most damage. | When a project faces many possible disruptions, it quickly becomes unclear which risks deserve attention first. It separates options, evaluation criteria, and open risks. The result is captured as a Risk Matrix and a Top Risk List. | A Business Model Stress Test checks how well a business model holds up under pressure and headwinds. It compares strengths, risks, market logic, and courses of action. The result is captured as a stress-test report and action plan per scenario. | Plans often contain assumptions that were never openly stated and remain dangerous precisely because of that. Assumption Surfacing makes these silent premises visible and prioritizes which of them carry the initiative or could sink it. |
Complexitydifferent | Medium | Low | High | Low |
Timedifferent | 1-3 h | 30-60 min | Half day | 45-90 min |
Participantsdifferent | 3-8 | 3-10 | 3-8 | 2-8 |
Formatdifferent | Workshop | Workshop + async | Workshop | Workshop + async |
Outputdifferent | Failure Scenarios, Risk Notes, Control Gaps, Test and Response Actions | Risk Matrix, Top Risk List | Stress Test Report, Action Plan per Scenario | Assumption List, Critical Assumptions, Learning Plan |
Tags1 shared | FailureResilienceRisk | RiskDecisionPrioritizationAssessment | StrategyBusiness modelRiskDiagnosis | AssumptionsRiskDecisionDiscovery |



