View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Engineering Failure Scenario Analysis | ![]() Delivery RAID Log | ![]() Decision Making Pre-Mortem | ![]() Decision Making Constraint Analysis |
|---|---|---|---|---|
Purposedifferent | In critical processes, it is not enough to plan only for the normal case. Failure Scenario Analysis looks at the path into failure and shows which failures, chains, and control gaps cause the most damage. | Helps clarify scope, sequence, and delivery flow in concrete terms. It makes work, boundaries, and order steerable. The result is captured as a RAID Log and a source for status reporting. | In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures. | When an initiative stalls, the limit often lies not in the idea but in hard or soft boundary conditions. Constraint Analysis separates these limits and shows which of them can actually be shaped. |
Complexitydifferent | Medium | Low | Low | Low |
Timedifferent | 1-3 h | 30 min Setup, dann laufend | 20–45 min | 30-90 min |
Participantsdifferent | 3-8 | 1-3 maintaining, briefing for everyone | Small cross-functional group | 2-8 |
Formatdifferent | Workshop | Async | Workshop | Workshop + async |
Outputdifferent | Failure Scenarios, Risk Notes, Control Gaps, Test and Response Actions | RAID Log, Status Report Source | Risk list, Mitigation plan, Assumption log | Constraint List, Hard/Soft Classification, Option Impact Notes, Decision Boundaries |
Tagsno overlap | FailureResilienceRisk | RiskTrackingStakeholdersGovernance | RiskDecisionFailurePlanning | ConstraintsDecisionPlanningOptions |



