View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Engineering Failure Scenario Analysis | ![]() Delivery RAID Log | ![]() Facilitation Power Interest Grid | ![]() Decision Making Pre-Mortem |
|---|---|---|---|---|
Purposedifferent | In critical processes, it is not enough to plan only for the normal case. Failure Scenario Analysis looks at the path into failure and shows which failures, chains, and control gaps cause the most damage. | Helps clarify scope, sequence, and delivery flow in concrete terms. It makes work, boundaries, and order steerable. The result is captured as a RAID Log and a source for status reporting. | When many stakeholders compete for attention at once, the Power Interest Grid sorts them by influence and stake. It turns individual contributions into a visible selection. The result is captured as a Power Interest Grid and a stakeholder-specific strategy. | In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures. |
Complexitydifferent | Medium | Low | Low | Low |
Timedifferent | 1-3 h | 30 min Setup, dann laufend | 30-60 min | 20–45 min |
Participantsdifferent | 3-8 | 1-3 maintaining, briefing for everyone | 2-8 | Small cross-functional group |
Formatdifferent | Workshop | Async | Workshop | Workshop |
Outputdifferent | Failure Scenarios, Risk Notes, Control Gaps, Test and Response Actions | RAID Log, Status Report Source | Power Interest Grid, Strategy per Stakeholder | Risk list, Mitigation plan, Assumption log |
Tagsno overlap | FailureResilienceRisk | RiskTrackingStakeholdersGovernance | StakeholdersFacilitationAlignmentPlanning | RiskDecisionFailurePlanning |



