View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Engineering Failure Scenario Analysis | ![]() Facilitation Power Interest Grid | ![]() Facilitation Stakeholder Salience Model | ![]() Delivery RAID Log |
|---|---|---|---|---|
Purposedifferent | In critical processes, it is not enough to plan only for the normal case. Failure Scenario Analysis looks at the path into failure and shows which failures, chains, and control gaps cause the most damage. | When many stakeholders compete for attention at once, the Power Interest Grid sorts them by influence and stake. It turns individual contributions into a visible selection. The result is captured as a Power Interest Grid and a stakeholder-specific strategy. | When stakeholders appear to matter very differently, the Stakeholder Salience Model rates their actual priority through power, legitimacy, and urgency. It turns individual contributions into a visible selection. The result is captured as a Salience diagram and a class-based strategy. | Helps clarify scope, sequence, and delivery flow in concrete terms. It makes work, boundaries, and order steerable. The result is captured as a RAID Log and a source for status reporting. |
Complexitydifferent | Medium | Low | Medium | Low |
Timedifferent | 1-3 h | 30-60 min | 60-90 min | 30 min Setup, dann laufend |
Participantsdifferent | 3-8 | 2-8 | 3-6 | 1-3 maintaining, briefing for everyone |
Formatdifferent | Workshop | Workshop | Workshop | Async |
Outputdifferent | Failure Scenarios, Risk Notes, Control Gaps, Test and Response Actions | Power Interest Grid, Strategy per Stakeholder | Salience Diagram, Strategy per Class | RAID Log, Status Report Source |
Tagsno overlap | FailureResilienceRisk | StakeholdersFacilitationAlignmentPlanning | StakeholdersFacilitationAlignmentGovernance | RiskTrackingStakeholdersGovernance |



