View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Engineering Failure Scenario Analysis | ![]() Systems Thinking Future Reality Tree | ![]() Decision Making Pre-Mortem | ![]() Decision Making Force Field Analysis |
|---|---|---|---|---|
Purposedifferent | In critical processes, it is not enough to plan only for the normal case. Failure Scenario Analysis looks at the path into failure and shows which failures, chains, and control gaps cause the most damage. | A Future Reality Tree shows how desired actions are meant to lead to a better system state. The method checks whether a path of change holds together logically before time flows into implementation. | In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures. | In change initiatives, supporting and restraining forces sit at the table at the same time. Force Field Analysis makes these tensions explicit and shows where change can be pushed forward by strengthening or relieving. |
Complexitydifferent | Medium | High | Low | Low |
Timedifferent | 1-3 h | 2-4 h | 20–45 min | 45-90 min |
Participantsdifferent | 3-8 | 3-8 | Small cross-functional group | 3-12 |
Formatsame | Workshop | Workshop | Workshop | Workshop |
Outputdifferent | Failure Scenarios, Risk Notes, Control Gaps, Test and Response Actions | Future Reality Tree, Negative Branches, Assumption List, Improved Injections | Risk list, Mitigation plan, Assumption log | Force Field Map, Change Levers, Risk Notes |
Tagsno overlap | FailureResilienceRisk | Theory of ConstraintsSystems thinkingChange | RiskDecisionFailurePlanning | ChangeDecisionStrategy |



