methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Failure Scenario Analysis.
Engineering
Failure Scenario Analysis
Paper illustration for Current Reality Tree
Systems Thinking
Current Reality Tree
Paper illustration for Constraint Analysis.
Decision Making
Constraint Analysis
A hypothetical failure makes concrete risks, signals, and fitting mitigations visible.
Decision Making
Pre-Mortem
Purposedifferent
In critical processes, it is not enough to plan only for the normal case. Failure Scenario Analysis looks at the path into failure and shows which failures, chains, and control gaps cause the most damage.A Current Reality Tree condenses many symptoms into a few causal chains. The method makes visible which core problems drive several negative effects at once.When an initiative stalls, the limit often lies not in the idea but in hard or soft boundary conditions. Constraint Analysis separates these limits and shows which of them can actually be shaped.In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures.
Complexitydifferent
MediumHighLowLow
Timedifferent
1-3 h2-6 h30-90 min20–45 min
Participantsdifferent
3-83-82-8Small cross-functional group
Formatdifferent
WorkshopWorkshopWorkshop + asyncWorkshop
Outputdifferent
Failure Scenarios, Risk Notes, Control Gaps, Test and Response ActionsCurrent Reality Tree, Core Problems, Intervention IdeasConstraint List, Hard/Soft Classification, Option Impact Notes, Decision BoundariesRisk list, Mitigation plan, Assumption log
Tagsno overlap
FailureResilienceRisk
Systems thinkingRoot causeConstraintsCausality
ConstraintsDecisionPlanningOptions
RiskDecisionFailurePlanning
Add more methods