View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
Selected:Failure Scenario AnalysisCost of DelayATAM (Architecture Tradeoff Analysis Method)Risk Matrix
| Criterion | ![]() Engineering Failure Scenario Analysis | ![]() Delivery Cost of Delay | ![]() Architecture ATAM (Architecture Tradeoff Analysis Method) | ![]() Decision Making Risk Matrix |
|---|---|---|---|---|
Purposedifferent | In critical processes, it is not enough to plan only for the normal case. Failure Scenario Analysis looks at the path into failure and shows which failures, chains, and control gaps cause the most damage. | Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence. | ATAM helps teams weigh architecture decisions when quality goals compete. The team considers business goals, stakeholder expectations, and technical decisions together. The evaluation shows which risks need further investigation. | When a project faces many possible disruptions, it quickly becomes unclear which risks deserve attention first. It separates options, evaluation criteria, and open risks. The result is captured as a Risk Matrix and a Top Risk List. |
Complexitydifferent | Medium | High | High | Low |
Timedifferent | 1-3 h | 90-180 min | Several meetings plus preparation and analysis; total effort depends on scope | 30-60 min |
Participantsdifferent | 3-8 | 3-8 | Evaluation team, architects, and relevant stakeholders | 3-10 |
Formatdifferent | Workshop | Workshop | Workshop + async | Workshop + async |
Outputdifferent | Failure Scenarios, Risk Notes, Control Gaps, Test and Response Actions | CoD Table, Prioritization Sequence | Prioritized quality scenarios in a utility tree, Architecture risks with reasoning and assumptions, Sensitivity and trade-off points, Findings report with open investigations | Risk Matrix, Top Risk List |
Tagsno overlap | FailureResilienceRisk | PrioritizationDeliveryEconomicsDecision | ArchitectureQualityRiskTradeoffsStakeholders | RiskDecisionPrioritizationAssessment |



