View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
Selected:Failure Scenario AnalysisATAM (Architecture Tradeoff Analysis Method)MORT AnalysisFault Tree Analysis
| Criterion | ![]() Engineering Failure Scenario Analysis | ![]() Architecture ATAM (Architecture Tradeoff Analysis Method) | ![]() Operations MORT Analysis | ![]() Operations Fault Tree Analysis |
|---|---|---|---|---|
Purposedifferent | In critical processes, it is not enough to plan only for the normal case. Failure Scenario Analysis looks at the path into failure and shows which failures, chains, and control gaps cause the most damage. | ATAM helps teams weigh architecture decisions when quality goals compete. The team considers business goals, stakeholder expectations, and technical decisions together. The evaluation shows which risks need further investigation. | For a safety-relevant event or a system with high protection requirements, the method examines where controls failed. It exposes both technical and organizational gaps. | For a critical top event with several possible triggers, the method logically models failure paths. It makes visible which combinations of conditions can lead to damage. |
Complexitydifferent | Medium | High | High | High |
Timedifferent | 1-3 h | Several meetings plus preparation and analysis; total effort depends on scope | Mehrere Tage bis Wochen | 2-6 h |
Participantsdifferent | 3-8 | Evaluation team, architects, and relevant stakeholders | 2-6 | 3-8 |
Formatdifferent | Workshop | Workshop + async | Workshop + async | Workshop + async |
Outputdifferent | Failure Scenarios, Risk Notes, Control Gaps, Test and Response Actions | Prioritized quality scenarios in a utility tree, Architecture risks with reasoning and assumptions, Sensitivity and trade-off points, Findings report with open investigations | MORT Worksheets, Findings per Branch, Corrective Actions, Systemic Recommendations | Fault Tree, Critical Paths, Cause Hypotheses, Control Actions |
Tagsno overlap | FailureResilienceRisk | ArchitectureQualityRiskTradeoffsStakeholders | Root causeSafetySystemicIncident | RiskRoot causeSafety |