methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Failure Scenario Analysis.
Engineering
Failure Scenario Analysis
Paper illustration: scenarios and architectural decisions are connected to identified risks.
Architecture
ATAM (Architecture Tradeoff Analysis Method)
Design sheets and interface cards connect to jointly written pseudocode with highlighted unresolved questions.
Architecture
ARID (Active Reviews for Intermediate Designs)
Paper illustration for Risk Storming.
Architecture
Risk Storming
Purposedifferent
In critical processes, it is not enough to plan only for the normal case. Failure Scenario Analysis looks at the path into failure and shows which failures, chains, and control gaps cause the most damage.ATAM helps teams weigh architecture decisions when quality goals compete. The team considers business goals, stakeholder expectations, and technical decisions together. The evaluation shows which risks need further investigation.ARID examines how well developers can work with a technical design. It focuses on a part of the system that can still be revised, between the architecture overview and the detailed specification.Helps clarify architecture context, options, and consequences in concrete terms. It organizes technical context, alternatives, and consequences. The result is captured as an Annotated Diagram, a Prioritized Risk List, and an Action Backlog.
Complexitydifferent
MediumHighMediumLow
Timedifferent
1-3 hSeveral meetings plus preparation and analysis; total effort depends on scope2–4 h review as a planning range; preparation and evaluation additional60-90 min
Participantsdifferent
3-8Evaluation team, architects, and relevant stakeholdersDesigners, developers as users, and facilitation4-12
Formatdifferent
WorkshopWorkshop + asyncWorkshop + asyncWorkshop
Outputdifferent
Failure Scenarios, Risk Notes, Control Gaps, Test and Response ActionsPrioritized quality scenarios in a utility tree, Architecture risks with reasoning and assumptions, Sensitivity and trade-off points, Findings report with open investigationsPrioritized development tasks, Jointly produced code or pseudocode, Observed difficulties and open design questions, Proposed design revisionsAnnotated Diagram, Prioritized Risk List, Action Backlog
Tagsno overlap
FailureResilienceRisk
ArchitectureQualityRiskTradeoffsStakeholders
ArchitectureEngineeringFeedbackValidationTasks
RiskArchitectureWorkshopValidation
Add more methods