View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Engineering Failure Scenario Analysis | ![]() Product Discovery Assumption Mapping | ![]() Decision Making Risk Matrix | ![]() Decision Making Pre-Mortem |
|---|---|---|---|---|
Purposedifferent | In critical processes, it is not enough to plan only for the normal case. Failure Scenario Analysis looks at the path into failure and shows which failures, chains, and control gaps cause the most damage. | When assumptions still sit unordered in the room, it weighs uncertainty against leverage. It makes visible which hypotheses should be checked first. | When a project faces many possible disruptions, it quickly becomes unclear which risks deserve attention first. It separates options, evaluation criteria, and open risks. The result is captured as a Risk Matrix and a Top Risk List. | In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures. |
Complexitydifferent | Medium | Medium | Low | Low |
Timedifferent | 1-3 h | 45-60 min | 30-60 min | 20–45 min |
Participantsdifferent | 3-8 | 2-8 | 3-10 | Small cross-functional group |
Formatdifferent | Workshop | Workshop + async | Workshop + async | Workshop |
Outputdifferent | Failure Scenarios, Risk Notes, Control Gaps, Test and Response Actions | Assumption map, Test backlog, Risk ranking | Risk Matrix, Top Risk List | Risk list, Mitigation plan, Assumption log |
Tags1 shared | FailureResilienceRisk | AssumptionsRiskExperimentsValidation | RiskDecisionPrioritizationAssessment | RiskDecisionFailurePlanning |



