methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Failure Scenario Analysis.
Engineering
Failure Scenario Analysis
Paper illustration for Alignment Mapping.
Facilitation
Alignment Mapping
Paper illustration: scenarios and architectural decisions are connected to identified risks.
Architecture
ATAM (Architecture Tradeoff Analysis Method)
Paper illustration of Power-Interest Grid with a method-specific labelled workspace.
Facilitation
Power Interest Grid
Purposedifferent
In critical processes, it is not enough to plan only for the normal case. Failure Scenario Analysis looks at the path into failure and shows which failures, chains, and control gaps cause the most damage.When several people work toward one goal but hold different mental maps, Alignment Mapping makes the discrepancies visible. It arranges goals, assumptions, and priorities so shared direction becomes verifiable.ATAM helps teams weigh architecture decisions when quality goals compete. The team considers business goals, stakeholder expectations, and technical decisions together. The evaluation shows which risks need further investigation.When many stakeholders compete for attention at once, the Power Interest Grid sorts them by influence and stake. It turns individual contributions into a visible selection. The result is captured as a Power Interest Grid and a stakeholder-specific strategy.
Complexitydifferent
MediumMediumHighLow
Timedifferent
1-3 h1-2 hSeveral meetings plus preparation and analysis; total effort depends on scope30-60 min
Participantsdifferent
3-84-12Evaluation team, architects, and relevant stakeholders2-8
Formatdifferent
WorkshopWorkshopWorkshop + asyncWorkshop
Outputdifferent
Failure Scenarios, Risk Notes, Control Gaps, Test and Response ActionsAlignment Map, Open Issues, Decision QuestionsPrioritized quality scenarios in a utility tree, Architecture risks with reasoning and assumptions, Sensitivity and trade-off points, Findings report with open investigationsPower Interest Grid, Strategy per Stakeholder
Tagsno overlap
FailureResilienceRisk
AlignmentStakeholdersStrategyFacilitation
ArchitectureQualityRiskTradeoffsStakeholders
StakeholdersFacilitationAlignmentPlanning
Add more methods