methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Evaporating Cloud.
Systems Thinking
Evaporating Cloud
Paper illustration for Monte Carlo Forecasting.
Delivery
Monte Carlo Forecasting
Paper illustration for Three-Point Estimation.
Decision Making
Three-Point Estimation
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Purposedifferent
The method makes visible why two seemingly incompatible demands arise and which assumption must be tested to resolve the conflict.Helps clarify scope, sequence, and delivery flow in concrete terms. It makes work, boundaries, and order steerable. The result is captured as Forecast Percentiles, Throughput Dataset, and Risk Communication.A single estimate for effort, time, or risk often looks too smooth for the real uncertainty behind it. It separates options, evaluation criteria, and open risks. The result is captured as a Three-Point Estimate, Risk Range, and Assumption Notes.When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.
Complexitydifferent
MediumHighMediumMedium
Timedifferent
60-120 min30-90 min Setup, danach laufend10-30 min je ItemOngoing
Participantsdifferent
2-81-81-82-12
Formatdifferent
WorkshopWorkshop + asyncWorkshop + asyncWorkshop + async
Outputdifferent
Conflict Cloud, Assumption List, Breakthrough Ideas, Next ExperimentsForecast Percentiles, Throughput Dataset, Risk CommunicationThree-Point Estimate, Risk Range, Assumption NotesKanban board, WIP policies, Flow metrics
Tagsno overlap
Theory of ConstraintsAssumptionsSystems thinking
ForecastingFlowDelivery
EstimationUncertaintyForecasting
FlowVisual managementDelivery
Add more methods