methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Evaporating Cloud.
Systems Thinking
Evaporating Cloud
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Paper illustration for Dot Estimation.
Facilitation
Dot Estimation
Paper illustration of a calm four-quadrant Assumption Map with hypothesis cards and emphasis on important assumptions with little evidence.
Product Discovery
Assumption Mapping
Purposedifferent
The method makes visible why two seemingly incompatible demands arise and which assumption must be tested to resolve the conflict.When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.When size or effort can only be estimated roughly, Dot Estimation condenses the group's experience into a quick range. It turns individual contributions into a visible selection. The result is captured as an Effort Heatmap, Risk Signals, and Discussion Targets.When assumptions still sit unordered in the room, it weighs uncertainty against leverage. It makes visible which hypotheses should be checked first.
Complexitydifferent
MediumMediumLowMedium
Timedifferent
60-120 minOngoing5-20 min45-60 min
Participantsdifferent
2-82-123-202-8
Formatdifferent
WorkshopWorkshop + asyncWorkshopWorkshop + async
Outputdifferent
Conflict Cloud, Assumption List, Breakthrough Ideas, Next ExperimentsKanban board, WIP policies, Flow metricsEffort Heatmap, Risk Signals, Discussion TargetsAssumption map, Test backlog, Risk ranking
Tagsno overlap
Theory of ConstraintsAssumptionsSystems thinking
FlowVisual managementDelivery
EstimationEffortRisk
AssumptionsRiskExperimentsValidation
Add more methods