methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Evaporating Cloud.
Systems Thinking
Evaporating Cloud
Paper illustration for Future Reality Tree.
Systems Thinking
Future Reality Tree
Paper illustration for PERT Estimation.
Decision Making
PERT Estimation
Paper illustration for Dot Estimation.
Facilitation
Dot Estimation
Purposedifferent
The method makes visible why two seemingly incompatible demands arise and which assumption must be tested to resolve the conflict.A Future Reality Tree shows how desired actions are meant to lead to a better system state. The method checks whether a path of change holds together logically before time flows into implementation.On complex initiatives, a plain average tends to understate just how uncertain the outcome really is. It separates options, evaluation criteria, and open risks. The result is captured as a PERT Estimate, Expected Value, and Risk Notes.When size or effort can only be estimated roughly, Dot Estimation condenses the group's experience into a quick range. It turns individual contributions into a visible selection. The result is captured as an Effort Heatmap, Risk Signals, and Discussion Targets.
Complexitydifferent
MediumHighMediumLow
Timedifferent
60-120 min2-4 h15-45 min5-20 min
Participantsdifferent
2-83-81-83-20
Formatdifferent
WorkshopWorkshopWorkshop + asyncWorkshop
Outputdifferent
Conflict Cloud, Assumption List, Breakthrough Ideas, Next ExperimentsFuture Reality Tree, Negative Branches, Assumption List, Improved InjectionsPERT Estimate, Expected Value, Risk NotesEffort Heatmap, Risk Signals, Discussion Targets
Tagsno overlap
Theory of ConstraintsAssumptionsSystems thinking
Theory of ConstraintsSystems thinkingChange
EstimationUncertaintyRisk
EstimationEffortRisk
Add more methods