methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of Double Diamond with its method-specific working model.
Innovation
Double Diamond
A hypothetical failure makes concrete risks, signals, and fitting mitigations visible.
Decision Making
Pre-Mortem
Paper illustration for ALPEN Method
Operations
ALPEN Method
Paper illustration for Failure Scenario Analysis.
Engineering
Failure Scenario Analysis
Purposedifferent
For complex problems with a fuzzy situation, the method cleanly separates search space and decision. It first creates breadth in understanding and then focus in elaboration. This brings open questions, problem definition, and solution path into a traceable movement.In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures.With an overloaded day full of too many tasks, a realistic picture of the day emerges. The method connects estimating, deciding, and buffer thinking so planning fits available energy and time.In critical processes, it is not enough to plan only for the normal case. Failure Scenario Analysis looks at the path into failure and shows which failures, chains, and control gaps cause the most damage.
Complexitydifferent
MediumLowLowMedium
Timedifferent
Wochen bis Monate20–45 min10-20 min daily1-3 h
Participantsdifferent
3-12Small cross-functional group13-8
Formatdifferent
Workshop + asyncWorkshopAsyncWorkshop
Outputdifferent
Problem Statement, Solution Options, Prototypes, Deliverables per PhaseRisk list, Mitigation plan, Assumption logDaily Plan, Time Estimates, Review NotesFailure Scenarios, Risk Notes, Control Gaps, Test and Response Actions
Tagsno overlap
ProcessDivergenceInnovation
RiskDecisionFailurePlanning
PlanningTime managementProductivityOperations
FailureResilienceRisk
Add more methods