Paper illustration for Dot Estimation.
Facilitation
Dot Estimation
Paper illustration for Three-Point Estimation.
Decision Making
Three-Point Estimation
A/B Testing workspace showing the question, observations, and next decision.
Growth
A/B Testing
Paper illustration of a calm four-quadrant Assumption Map with hypothesis cards and emphasis on important assumptions with little evidence.
Product Discovery
Assumption Mapping
Purposedifferent
When size or effort can only be estimated roughly, Dot Estimation condenses the group's experience into a quick range. It turns individual contributions into a visible selection. The result is captured as an Effort Heatmap, Risk Signals, and Discussion Targets.A single estimate for effort, time, or risk often looks too smooth for the real uncertainty behind it. It separates options, evaluation criteria, and open risks. The result is captured as a Three-Point Estimate, Risk Range, and Assumption Notes.When two variants compete, discussions quickly decide by taste rather than effect. A/B Testing checks behavior under controlled conditions and separates real improvement from chance or expectation effects.When assumptions still sit unordered in the room, it weighs uncertainty against leverage. It makes visible which hypotheses should be checked first.
Complexitydifferent
LowMediumHighMedium
Timedifferent
5-20 min10-30 min je Item1-4 Wochen45-60 min
Participantsdifferent
3-201-81-62-8
Formatdifferent
WorkshopWorkshop + asyncAsyncWorkshop + async
Outputdifferent
Effort Heatmap, Risk Signals, Discussion TargetsThree-Point Estimate, Risk Range, Assumption NotesExperiment results, Decision log, Learning summaryAssumption map, Test backlog, Risk ranking
Tagsno overlap
EstimationEffortRisk
EstimationUncertaintyForecasting
ExperimentsGrowthAnalyticsValidation
AssumptionsRiskExperimentsValidation