View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
Selected:Dot EstimationStandard Work AnalysisThree-Point EstimationFailure Mode and Effects Analysis
| Criterion | ![]() Facilitation Dot Estimation | ![]() Operations Standard Work Analysis | ![]() Decision Making Three-Point Estimation | ![]() Operations Failure Mode and Effects Analysis |
|---|---|---|---|---|
Purposedifferent | When size or effort can only be estimated roughly, Dot Estimation condenses the group's experience into a quick range. It turns individual contributions into a visible selection. The result is captured as an Effort Heatmap, Risk Signals, and Discussion Targets. | When the same task is done differently depending on the person, the method exposes the reliable core. It creates comparability without unnecessarily choking off needed latitude. | A single estimate for effort, time, or risk often looks too smooth for the real uncertainty behind it. It separates options, evaluation criteria, and open risks. The result is captured as a Three-Point Estimate, Risk Range, and Assumption Notes. | For a process, product, or service with noticeable failure risks, the method assesses possible failure modes in advance. It directs attention to combinations of occurrence, effect, and detectability. |
Complexitydifferent | Low | Medium | Medium | High |
Timedifferent | 5-20 min | 1-3 h | 10-30 min je Item | 2-6 h |
Participantsdifferent | 3-20 | 2-6 | 1-8 | 3-10 |
Formatdifferent | Workshop | Workshop | Workshop + async | Workshop |
Outputdifferent | Effort Heatmap, Risk Signals, Discussion Targets | Standard Work Sheet, Deviation List, Improved Standard, Training Needs | Three-Point Estimate, Risk Range, Assumption Notes | FMEA Table, Risk Priority, Mitigation Actions |
Tagsno overlap | EstimationEffortRisk | LeanProcessQuality | EstimationUncertaintyForecasting | RiskQualityOperationsRoot cause |



