View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Facilitation Dot Estimation | ![]() Operations Root Cause Tree Analysis | ![]() Operations MORT Analysis | ![]() Operations Barrier Analysis |
|---|---|---|---|---|
Purposedifferent | When size or effort can only be estimated roughly, Dot Estimation condenses the group's experience into a quick range. It turns individual contributions into a visible selection. The result is captured as an Effort Heatmap, Risk Signals, and Discussion Targets. | For a problem with several suspected causes, the method builds a causal structure instead of a mere list. It makes visible how causes connect and where the strongest points of leverage lie. | For a safety-relevant event or a system with high protection requirements, the method examines where controls failed. It exposes both technical and organizational gaps. | For a risk that can only be managed through multiple layers of protection, the method examines the effectiveness of each barrier. It shows where safeguards are missing, too weak, or fail under real conditions. |
Complexitydifferent | Low | Medium | High | Medium |
Timedifferent | 5-20 min | 1-3 h | Mehrere Tage bis Wochen | 2-4 h |
Participantsdifferent | 3-20 | 2-8 | 2-6 | 2-6 |
Formatdifferent | Workshop | Workshop | Workshop + async | Workshop + async |
Outputdifferent | Effort Heatmap, Risk Signals, Discussion Targets | Cause Tree, Evidence Notes, Countermeasures | MORT Worksheets, Findings per Branch, Corrective Actions, Systemic Recommendations | Barrier Inventory, Failure Analysis per Barrier, Action Backlog |
Tagsno overlap | EstimationEffortRisk | Root causeTreeIncidentQuality | Root causeSafetySystemicIncident | Root causeSafetyIncident |



