Facilitation
Dot Estimation
A hypothetical failure makes concrete risks, signals, and fitting mitigations visible.
Decision Making
Pre-Mortem
Paper illustration of a calm four-quadrant Assumption Map with hypothesis cards and emphasis on important assumptions with little evidence.
Product Discovery
Assumption Mapping
A/B Testing workspace showing the question, observations, and next decision.
Growth
A/B Testing
Purposedifferent
When size or effort can only be estimated roughly, Dot Estimation condenses the group's experience into a quick range. It turns individual contributions into a visible selection. The result is captured as an Effort Heatmap, Risk Signals, and Discussion Targets.In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures.When assumptions still sit unordered in the room, it weighs uncertainty against leverage. It makes visible which hypotheses should be checked first.When two variants compete, discussions quickly decide by taste rather than effect. A/B Testing checks behavior under controlled conditions and separates real improvement from chance or expectation effects.
Complexitydifferent
LowLowMediumHigh
Timedifferent
5-20 min20–45 min45-60 min1-4 Wochen
Participantsdifferent
3-20Small cross-functional group2-81-6
Formatdifferent
WorkshopWorkshopWorkshop + asyncAsync
Outputdifferent
Effort Heatmap, Risk Signals, Discussion TargetsRisk list, Mitigation plan, Assumption logAssumption map, Test backlog, Risk rankingExperiment results, Decision log, Learning summary
Tagsno overlap
EstimationEffortRisk
RiskDecisionFailurePlanning
AssumptionsRiskExperimentsValidation
ExperimentsGrowthAnalyticsValidation