Criterion
Paper illustration for Dot Estimation.
Facilitation
Dot Estimation
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Paper illustration of Leverage Points with its method-specific working model.
Systems Thinking
Leverage Points
Paper illustration for Ideal Days.
Agile
Ideal Days
Purposedifferent
When size or effort can only be estimated roughly, Dot Estimation condenses the group's experience into a quick range. It turns individual contributions into a visible selection. The result is captured as an Effort Heatmap, Risk Signals, and Discussion Targets.When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.Leverage Points show exactly where interventions in a system produce a disproportionate effect. It draws relationships, patterns, and feedback loops. The result is captured as a leverage map and action strategy.When effort needs to be thought of as real working time, it offers a simple common denominator for comparison. It sorts work by value, risk, and delivery ability. The result is captured as Ideal Day Estimates, Assumption Notes, and Capacity Caveats.
Complexitydifferent
LowMediumHighLow
Timedifferent
5-20 minOngoingHalf day15-60 min
Participantsdifferent
3-202-123-122-9
Formatdifferent
WorkshopWorkshop + asyncWorkshopWorkshop + async
Outputdifferent
Effort Heatmap, Risk Signals, Discussion TargetsKanban board, WIP policies, Flow metricsLeverage Map, Action StrategyIdeal Day Estimates, Assumption Notes, Capacity Caveats
Tagsno overlap
EstimationEffortRisk
FlowVisual managementDelivery
Systems thinkingChangeStrategy
EstimationEffortAgile