View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Facilitation Dot Estimation | ![]() Engineering Kanban | ![]() Operations Fault Tree Analysis | ![]() Operations Barrier Analysis |
|---|---|---|---|---|
Purposedifferent | When size or effort can only be estimated roughly, Dot Estimation condenses the group's experience into a quick range. It turns individual contributions into a visible selection. The result is captured as an Effort Heatmap, Risk Signals, and Discussion Targets. | When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable. | For a critical top event with several possible triggers, the method logically models failure paths. It makes visible which combinations of conditions can lead to damage. | For a risk that can only be managed through multiple layers of protection, the method examines the effectiveness of each barrier. It shows where safeguards are missing, too weak, or fail under real conditions. |
Complexitydifferent | Low | Medium | High | Medium |
Timedifferent | 5-20 min | Ongoing | 2-6 h | 2-4 h |
Participantsdifferent | 3-20 | 2-12 | 3-8 | 2-6 |
Formatdifferent | Workshop | Workshop + async | Workshop + async | Workshop + async |
Outputdifferent | Effort Heatmap, Risk Signals, Discussion Targets | Kanban board, WIP policies, Flow metrics | Fault Tree, Critical Paths, Cause Hypotheses, Control Actions | Barrier Inventory, Failure Analysis per Barrier, Action Backlog |
Tagsno overlap | EstimationEffortRisk | FlowVisual managementDelivery | RiskRoot causeSafety | Root causeSafetyIncident |



