methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Dot Estimation.
Facilitation
Dot Estimation
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Paper illustration for Evaporating Cloud.
Systems Thinking
Evaporating Cloud
Paper illustration for Future Reality Tree.
Systems Thinking
Future Reality Tree
Purposedifferent
When size or effort can only be estimated roughly, Dot Estimation condenses the group's experience into a quick range. It turns individual contributions into a visible selection. The result is captured as an Effort Heatmap, Risk Signals, and Discussion Targets.When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.The method makes visible why two seemingly incompatible demands arise and which assumption must be tested to resolve the conflict.A Future Reality Tree shows how desired actions are meant to lead to a better system state. The method checks whether a path of change holds together logically before time flows into implementation.
Complexitydifferent
LowMediumMediumHigh
Timedifferent
5-20 minOngoing60-120 min2-4 h
Participantsdifferent
3-202-122-83-8
Formatdifferent
WorkshopWorkshop + asyncWorkshopWorkshop
Outputdifferent
Effort Heatmap, Risk Signals, Discussion TargetsKanban board, WIP policies, Flow metricsConflict Cloud, Assumption List, Breakthrough Ideas, Next ExperimentsFuture Reality Tree, Negative Branches, Assumption List, Improved Injections
Tagsno overlap
EstimationEffortRisk
FlowVisual managementDelivery
Theory of ConstraintsAssumptionsSystems thinking
Theory of ConstraintsSystems thinkingChange
Add more methods