methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Dot Estimation.
Facilitation
Dot Estimation
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Paper illustration: scenarios and architectural decisions are connected to identified risks.
Architecture
ATAM (Architecture Tradeoff Analysis Method)
Paper illustration for Communication Plan
Delivery
Communication Plan
Purposedifferent
When size or effort can only be estimated roughly, Dot Estimation condenses the group's experience into a quick range. It turns individual contributions into a visible selection. The result is captured as an Effort Heatmap, Risk Signals, and Discussion Targets.When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.ATAM helps teams weigh architecture decisions when quality goals compete. The team considers business goals, stakeholder expectations, and technical decisions together. The evaluation shows which risks need further investigation.When many people need to be informed in parallel and messages would otherwise arrive unevenly or too late, a Communication Plan orders communication reliably. Channels, audiences, and cadences interlock so important information doesn't get lost.
Complexitydifferent
LowMediumHighLow
Timedifferent
5-20 minOngoingSeveral meetings plus preparation and analysis; total effort depends on scope45-90 min
Participantsdifferent
3-202-12Evaluation team, architects, and relevant stakeholders2-6
Formatdifferent
WorkshopWorkshop + asyncWorkshop + asyncWorkshop + async
Outputdifferent
Effort Heatmap, Risk Signals, Discussion TargetsKanban board, WIP policies, Flow metricsPrioritized quality scenarios in a utility tree, Architecture risks with reasoning and assumptions, Sensitivity and trade-off points, Findings report with open investigationsCommunication Plan, Channel Matrix, Message Cadence
Tagsno overlap
EstimationEffortRisk
FlowVisual managementDelivery
ArchitectureQualityRiskTradeoffsStakeholders
CommunicationStakeholdersDeliveryPlanning
Add more methods