View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Facilitation Dot Estimation | ![]() Operations Getting Things Done | ![]() Operations Failure Mode and Effects Analysis | ![]() Operations ALPEN Method |
|---|---|---|---|---|
Purposedifferent | When size or effort can only be estimated roughly, Dot Estimation condenses the group's experience into a quick range. It turns individual contributions into a visible selection. The result is captured as an Effort Heatmap, Risk Signals, and Discussion Targets. | With many open commitments and ideas in daily life, a reliable external storage system emerges. The method relieves the mind so priority and context don't have to compete in memory. | For a process, product, or service with noticeable failure risks, the method assesses possible failure modes in advance. It directs attention to combinations of occurrence, effect, and detectability. | With an overloaded day full of too many tasks, a realistic picture of the day emerges. The method connects estimating, deciding, and buffer thinking so planning fits available energy and time. |
Complexitydifferent | Low | Medium | High | Low |
Timedifferent | 5-20 min | 1-2 h Setup, laufend | 2-6 h | 10-20 min daily |
Participantsdifferent | 3-20 | 1 | 3-10 | 1 |
Formatdifferent | Workshop | Async | Workshop | Async |
Outputdifferent | Effort Heatmap, Risk Signals, Discussion Targets | Action Lists, Project List, Review Routine | FMEA Table, Risk Priority, Mitigation Actions | Daily Plan, Time Estimates, Review Notes |
Tagsno overlap | EstimationEffortRisk | ProductivityPlanningTasksExecution | RiskQualityOperationsRoot cause | PlanningTime managementProductivityOperations |



