methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Dot Estimation.
Facilitation
Dot Estimation
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay
Paper illustration of a calm four-quadrant Assumption Map with hypothesis cards and emphasis on important assumptions with little evidence.
Product Discovery
Assumption Mapping
Paper illustration of a calibrated five-by-five risk matrix with response cards.
Decision Making
Risk Matrix
Purposedifferent
When size or effort can only be estimated roughly, Dot Estimation condenses the group's experience into a quick range. It turns individual contributions into a visible selection. The result is captured as an Effort Heatmap, Risk Signals, and Discussion Targets.Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence.When assumptions still sit unordered in the room, it weighs uncertainty against leverage. It makes visible which hypotheses should be checked first.When a project faces many possible disruptions, it quickly becomes unclear which risks deserve attention first. It separates options, evaluation criteria, and open risks. The result is captured as a Risk Matrix and a Top Risk List.
Complexitydifferent
LowHighMediumLow
Timedifferent
5-20 min90-180 min45-60 min30-60 min
Participantsdifferent
3-203-82-83-10
Formatdifferent
WorkshopWorkshopWorkshop + asyncWorkshop + async
Outputdifferent
Effort Heatmap, Risk Signals, Discussion TargetsCoD Table, Prioritization SequenceAssumption map, Test backlog, Risk rankingRisk Matrix, Top Risk List
Tagsno overlap
EstimationEffortRisk
PrioritizationDeliveryEconomicsDecision
AssumptionsRiskExperimentsValidation
RiskDecisionPrioritizationAssessment
Add more methods