methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Dot Estimation.
Facilitation
Dot Estimation
A paper-based illustration representing C4 Model with its core stages and visible working result.
Architecture
C4 Model
Paper illustration of a calm four-quadrant Assumption Map with hypothesis cards and emphasis on important assumptions with little evidence.
Product Discovery
Assumption Mapping
A/B Testing workspace showing the question, observations, and next decision.
Growth
A/B Testing
Purposedifferent
When size or effort can only be estimated roughly, Dot Estimation condenses the group's experience into a quick range. It turns individual contributions into a visible selection. The result is captured as an Effort Heatmap, Risk Signals, and Discussion Targets.The C4 Model makes a system legible across several resolution levels, from context down to code. It suits situations where different audiences need to understand the same architecture from different altitudes.When assumptions still sit unordered in the room, it weighs uncertainty against leverage. It makes visible which hypotheses should be checked first.When two variants compete, discussions quickly decide by taste rather than effect. A/B Testing checks behavior under controlled conditions and separates real improvement from chance or expectation effects.
Complexitydifferent
LowLowMediumHigh
Timedifferent
5-20 min1-4 h45-60 min1-4 Wochen
Participantsdifferent
3-201-52-81-6
Formatdifferent
WorkshopWorkshop + asyncWorkshop + asyncAsync
Outputdifferent
Effort Heatmap, Risk Signals, Discussion TargetsContext Diagram, Container Diagram, Component DiagramAssumption map, Test backlog, Risk rankingExperiment results, Decision log, Learning summary
Tagsno overlap
EstimationEffortRisk
ArchitectureCommunicationVisualization
AssumptionsRiskExperimentsValidation
ExperimentsGrowthAnalyticsValidation
Add more methods