View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Facilitation Dot Estimation | ![]() Agile Bucket System | ![]() Systems Thinking Future Reality Tree | ![]() Systems Thinking Intervention Mapping |
|---|---|---|---|---|
Purposedifferent | When size or effort can only be estimated roughly, Dot Estimation condenses the group's experience into a quick range. It turns individual contributions into a visible selection. The result is captured as an Effort Heatmap, Risk Signals, and Discussion Targets. | When a large batch of work needs a fast, rough estimate, it sorts items into predefined size buckets. It sorts work by value, risk, and delivery ability. The result is captured as a Bucketed Backlog, Relative Estimates, and Split Candidates. | A Future Reality Tree shows how desired actions are meant to lead to a better system state. The method checks whether a path of change holds together logically before time flows into implementation. | Intervention Mapping translates a need for change into a planned, evaluable program. The method connects target group, determinants, actions, and measurement into a traceable chain. |
Complexitydifferent | Low | Medium | High | High |
Timedifferent | 5-20 min | 30-90 min | 2-4 h | 1-5 Tage |
Participantsdifferent | 3-20 | 3-12 | 3-8 | 4-12 |
Formatdifferent | Workshop | Workshop | Workshop | Workshop + async |
Outputdifferent | Effort Heatmap, Risk Signals, Discussion Targets | Bucketed Backlog, Relative Estimates, Split Candidates | Future Reality Tree, Negative Branches, Assumption List, Improved Injections | Logic Model, Change Objectives, Intervention Components, Evaluation Plan |
Tagsno overlap | EstimationEffortRisk | EstimationBacklogRelative sizing | Theory of ConstraintsSystems thinkingChange | ChangeSystems thinkingCapability |