View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Operations DMAIC | ![]() Engineering Kanban | ![]() Operations 8D Problem Solving | ![]() Operations 5 Whys |
|---|---|---|---|---|
Purposedifferent | For a process problem with fluctuating performance, the method brings analysis and improvement into a disciplined sequence. It creates a framework in which numbers, causes, and control come together. | When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable. | For an acute quality or delivery problem, the method structures immediate protection and root cause work together. It keeps the situation stable while the actual cause is investigated cleanly. | For a single, hard-to-explain deviation, the method exposes the causal chain behind the visible symptom. It keeps the cause open until a controllable condition emerges instead of a mere description. |
Complexitydifferent | High | Medium | High | Low |
Timedifferent | 2-12 Wochen | Ongoing | 1-6 Wochen | 15-30 min |
Participantsdifferent | 3-10 | 2-12 | 4-10 | 2-6 |
Formatdifferent | Workshop + async | Workshop + async | Workshop + async | Workshop |
Outputdifferent | Project Charter, Measurement Plan, Cause Analysis, Control Plan | Kanban board, WIP policies, Flow metrics | 8D Report, Containment Plan, Root Cause Evidence, Corrective Action Plan | Root cause notes, Countermeasures |
Tagsno overlap | Continuous improvementQualityProcess improvement | FlowVisual managementDelivery | QualityProblem solvingRoot cause | Root causeIncidentLeanProblem solving |



