View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Innovation Design Thinking | ![]() Operations Failure Mode and Effects Analysis | ![]() Operations Fault Tree Analysis | ![]() Operations Fishbone Diagram |
|---|---|---|---|---|
Purposedifferent | For complex user problems with an uncertain cause, the method connects observation, interpretation, and experiment into a learning cycle. It keeps the focus on real needs and avoids premature solution language. This produces robust decisions for product and service. | For a process, product, or service with noticeable failure risks, the method assesses possible failure modes in advance. It directs attention to combinations of occurrence, effect, and detectability. | For a critical top event with several possible triggers, the method logically models failure paths. It makes visible which combinations of conditions can lead to damage. | When a problem has several possible contributing factors, the method sorts causes by cause areas. It prevents an initial hunch from blocking the view of other plausible drivers. |
Complexitydifferent | High | High | High | Low |
Timedifferent | 1 Tag bis mehrere Wochen | 2-6 h | 2-6 h | 30-60 min |
Participantsdifferent | 4-10 | 3-10 | 3-8 | 2-8 |
Formatdifferent | Workshop | Workshop | Workshop + async | Workshop |
Outputdifferent | Problem Statement, Prototype, Test Learnings | FMEA Table, Risk Priority, Mitigation Actions | Fault Tree, Critical Paths, Cause Hypotheses, Control Actions | Fishbone Diagram, Cause Categories, Investigation Backlog |
Tagsno overlap | InnovationPrototypeResearch | RiskQualityOperationsRoot cause | RiskRoot causeSafety | Root causeQualityOperations |



