methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
A paper-based illustration representing Design Sprint with its core stages and visible working result.
Innovation
Design Sprint
Paper illustration of Request for Comments (RFC) with its method-specific working model.
Architecture
Request for Comments
Design sheets and interface cards connect to jointly written pseudocode with highlighted unresolved questions.
Architecture
ARID (Active Reviews for Intermediate Designs)
Paper illustration of Decision Rights Mapping with its method-specific working model.
Decision Making
Decision Rights Mapping
Purposedifferent
When the product question is unclear and time pressure is high, the method takes a team from an open idea to a testable solution. It connects problem understanding, decision, and learning in one compact format, lowering the risk of spending a lot of energy on a mere guess.An RFC clarifies architecture context, options, and consequences. It structures technical context, alternatives, tradeoffs, open questions, and review feedback, and captures the result as an RFC document, reviewer comments, and a decision rationale.ARID examines how well developers can work with a technical design. It focuses on a part of the system that can still be revised, between the architecture overview and the detailed specification.In organizations with many stakeholders, it often blurs who actually decides and who is merely consulted. It separates options, evaluation criteria, and open risks. The result is captured as a Decision Rights matrix and an agreement.
Complexitydifferent
HighMediumMediumMedium
Timedifferent
4-5 Tage1-3 Wochen vom Draft bis zur Entscheidung2–4 h review as a planning range; preparation and evaluation additional90-180 min
Participantsdifferent
5-83-20 ReviewerDesigners, developers as users, and facilitation4-12
Formatdifferent
WorkshopAsyncWorkshop + asyncWorkshop
Outputdifferent
Prototype, Test Findings, Decision RationaleRFC document, Reviewer comments, Decision rationale, Follow-up ADR or ticketsPrioritized development tasks, Jointly produced code or pseudocode, Observed difficulties and open design questions, Proposed design revisionsDecision Rights Matrix, Agreement
Tagsno overlap
Design sprintPrototypeValidationInnovation
ArchitectureDecisionAsyncGovernance
ArchitectureEngineeringFeedbackValidationTasks
DecisionGovernanceAlignmentResponsibility
Add more methods