methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Decision Tree method illustration showing its working structure
Decision Making
Decision Tree
Paper illustration for Time Blocking
Operations
Time Blocking
Paper illustration for Failure Scenario Analysis.
Engineering
Failure Scenario Analysis
A hypothetical failure makes concrete risks, signals, and fitting mitigations visible.
Decision Making
Pre-Mortem
Purposedifferent
For decisions with follow-on paths and dependencies, a linear comparison is often not enough. A Decision Tree shows how options branch under conditions and which consequences hang on each branch.With a calendar that grows on request, the method makes available time explicit again. It combines appointments, focus work, and buffer into a more realistic day structure.In critical processes, it is not enough to plan only for the normal case. Failure Scenario Analysis looks at the path into failure and shows which failures, chains, and control gaps cause the most damage.In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures.
Complexitydifferent
MediumLowMediumLow
Timedifferent
30-90 min15-30 min Planung, laufend1-3 h20–45 min
Participantsdifferent
1-613-8Small cross-functional group
Formatdifferent
Workshop + asyncAsyncWorkshopWorkshop
Outputdifferent
Decision Tree, Option Map, Assumption ListBlocked Calendar, Capacity View, Focus PlanFailure Scenarios, Risk Notes, Control Gaps, Test and Response ActionsRisk list, Mitigation plan, Assumption log
Tagsno overlap
DecisionTreeOptions
PlanningTime managementFocus
FailureResilienceRisk
RiskDecisionFailurePlanning
Add more methods