methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of the Lightning Decision Jam working structure.
Facilitation
Decision Jam
Paper illustration for Future Reality Tree.
Systems Thinking
Future Reality Tree
Paper illustration for 8D Problem Solving.
Operations
8D Problem Solving
A 5 Whys working surface connects an observable problem with evidenced causes, marked uncertainty and concrete countermeasures with ownership.
Operations
5 Whys
Purposedifferent
When a decision is stuck, Decision Jam loosens the knot through structured separation of problem, idea, and selection. The format creates movement without jumping prematurely at the first seemingly elegant answer.A Future Reality Tree shows how desired actions are meant to lead to a better system state. The method checks whether a path of change holds together logically before time flows into implementation.For an acute quality or delivery problem, the method structures immediate protection and root cause work together. It keeps the situation stable while the actual cause is investigated cleanly.For a single, hard-to-explain deviation, the method exposes the causal chain behind the visible symptom. It keeps the cause open until a controllable condition emerges instead of a mere description.
Complexitydifferent
LowHighHighLow
Timedifferent
60-90 min2-4 h1-6 Wochen15-30 min
Participantsdifferent
4-103-84-102-6
Formatdifferent
WorkshopWorkshopWorkshop + asyncWorkshop
Outputdifferent
Problem Cluster, Prioritized Challenge, ExperimentFuture Reality Tree, Negative Branches, Assumption List, Improved Injections8D Report, Containment Plan, Root Cause Evidence, Corrective Action PlanRoot cause notes, Countermeasures
Tagsno overlap
FacilitationDecisionProblem solvingWorkshop
Theory of ConstraintsSystems thinkingChange
QualityProblem solvingRoot cause
Root causeIncidentLeanProblem solving
Add more methods