View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Facilitation Decision Jam | ![]() Decision Making Assumption Surfacing | ![]() Operations 5 Whys | ![]() Operations 8D Problem Solving |
|---|---|---|---|---|
Purposedifferent | When a decision is stuck, Decision Jam loosens the knot through structured separation of problem, idea, and selection. The format creates movement without jumping prematurely at the first seemingly elegant answer. | Plans often contain assumptions that were never openly stated and remain dangerous precisely because of that. Assumption Surfacing makes these silent premises visible and prioritizes which of them carry the initiative or could sink it. | For a single, hard-to-explain deviation, the method exposes the causal chain behind the visible symptom. It keeps the cause open until a controllable condition emerges instead of a mere description. | For an acute quality or delivery problem, the method structures immediate protection and root cause work together. It keeps the situation stable while the actual cause is investigated cleanly. |
Complexitydifferent | Low | Low | Low | High |
Timedifferent | 60-90 min | 45-90 min | 15-30 min | 1-6 Wochen |
Participantsdifferent | 4-10 | 2-8 | 2-6 | 4-10 |
Formatdifferent | Workshop | Workshop + async | Workshop | Workshop + async |
Outputdifferent | Problem Cluster, Prioritized Challenge, Experiment | Assumption List, Critical Assumptions, Learning Plan | Root cause notes, Countermeasures | 8D Report, Containment Plan, Root Cause Evidence, Corrective Action Plan |
Tagsno overlap | FacilitationDecisionProblem solvingWorkshop | AssumptionsRiskDecisionDiscovery | Root causeIncidentLeanProblem solving | QualityProblem solvingRoot cause |



