methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of the Lightning Decision Jam working structure.
Facilitation
Decision Jam
Design sheets and interface cards connect to jointly written pseudocode with highlighted unresolved questions.
Architecture
ARID (Active Reviews for Intermediate Designs)
Paper illustration of Request for Comments (RFC) with its method-specific working model.
Architecture
Request for Comments
Paper illustration for DACI
Decision Making
DACI
Purposedifferent
When a decision is stuck, Decision Jam loosens the knot through structured separation of problem, idea, and selection. The format creates movement without jumping prematurely at the first seemingly elegant answer.ARID examines how well developers can work with a technical design. It focuses on a part of the system that can still be revised, between the architecture overview and the detailed specification.An RFC clarifies architecture context, options, and consequences. It structures technical context, alternatives, tradeoffs, open questions, and review feedback, and captures the result as an RFC document, reviewer comments, and a decision rationale.In cross-functional decisions, responsibilities quickly blur between approval, influence, and execution. DACI arranges these roles so decision pressure, contribution, and information stay cleanly separated.
Complexitydifferent
LowMediumMediumLow
Timedifferent
60-90 min2–4 h review as a planning range; preparation and evaluation additional1-3 Wochen vom Draft bis zur Entscheidung30-60 min
Participantsdifferent
4-10Designers, developers as users, and facilitation3-20 Reviewer2-10
Formatdifferent
WorkshopWorkshop + asyncAsyncWorkshop + async
Outputdifferent
Problem Cluster, Prioritized Challenge, ExperimentPrioritized development tasks, Jointly produced code or pseudocode, Observed difficulties and open design questions, Proposed design revisionsRFC document, Reviewer comments, Decision rationale, Follow-up ADR or ticketsDACI Matrix, Decision Owner, Decision Log
Tagsno overlap
FacilitationDecisionProblem solvingWorkshop
ArchitectureEngineeringFeedbackValidationTasks
ArchitectureDecisionAsyncGovernance
DecisionRolesGovernanceAlignment
Add more methods