methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of the Lightning Decision Jam working structure.
Facilitation
Decision Jam
Paper illustration for 8D Problem Solving.
Operations
8D Problem Solving
Paper illustration for Kepner-Tregoe
Operations
Kepner-Tregoe
A 5 Whys working surface connects an observable problem with evidenced causes, marked uncertainty and concrete countermeasures with ownership.
Operations
5 Whys
Purposedifferent
When a decision is stuck, Decision Jam loosens the knot through structured separation of problem, idea, and selection. The format creates movement without jumping prematurely at the first seemingly elegant answer.For an acute quality or delivery problem, the method structures immediate protection and root cause work together. It keeps the situation stable while the actual cause is investigated cleanly.For a disturbance that's hard to pin down, the method cleanly separates problem, cause, and decision. It reduces mixing when symptoms allow several interpretations.For a single, hard-to-explain deviation, the method exposes the causal chain behind the visible symptom. It keeps the cause open until a controllable condition emerges instead of a mere description.
Complexitydifferent
LowHighHighLow
Timedifferent
60-90 min1-6 Wochen2-8 h15-30 min
Participantsdifferent
4-104-102-82-6
Formatdifferent
WorkshopWorkshop + asyncWorkshop + asyncWorkshop
Outputdifferent
Problem Cluster, Prioritized Challenge, Experiment8D Report, Containment Plan, Root Cause Evidence, Corrective Action PlanProblem Analysis, Decision Analysis, Risk PlanRoot cause notes, Countermeasures
Tags1 shared
FacilitationDecisionProblem solvingWorkshop
QualityProblem solvingRoot cause
Problem solvingRoot causeDecisionOperations
Root causeIncidentLeanProblem solving
Add more methods