methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of the Lightning Decision Jam working structure.
Facilitation
Decision Jam
A 5 Whys working surface connects an observable problem with evidenced causes, marked uncertainty and concrete countermeasures with ownership.
Operations
5 Whys
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay
Paper illustration for 8D Problem Solving.
Operations
8D Problem Solving
Purposedifferent
When a decision is stuck, Decision Jam loosens the knot through structured separation of problem, idea, and selection. The format creates movement without jumping prematurely at the first seemingly elegant answer.For a single, hard-to-explain deviation, the method exposes the causal chain behind the visible symptom. It keeps the cause open until a controllable condition emerges instead of a mere description.Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence.For an acute quality or delivery problem, the method structures immediate protection and root cause work together. It keeps the situation stable while the actual cause is investigated cleanly.
Complexitydifferent
LowLowHighHigh
Timedifferent
60-90 min15-30 min90-180 min1-6 Wochen
Participantsdifferent
4-102-63-84-10
Formatdifferent
WorkshopWorkshopWorkshopWorkshop + async
Outputdifferent
Problem Cluster, Prioritized Challenge, ExperimentRoot cause notes, CountermeasuresCoD Table, Prioritization Sequence8D Report, Containment Plan, Root Cause Evidence, Corrective Action Plan
Tagsno overlap
FacilitationDecisionProblem solvingWorkshop
Root causeIncidentLeanProblem solving
PrioritizationDeliveryEconomicsDecision
QualityProblem solvingRoot cause
Add more methods