View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Innovation Crazy 8s | ![]() Engineering Goal Question Metric |
|---|---|---|
Purposedifferent | With only a few minutes available and a still-fuzzy solution search, the method forces a wide range of variants. It produces fast sketches before the first idea can settle in, making different directions directly comparable and open to further development. | Helps clarify technical problems, hypotheses, and next steps in concrete terms. It breaks a technical problem into testable parts. The result is captured as a GQM table and metric briefs. |
Complexitydifferent | Low | Medium |
Timedifferent | 8-15 min | 90-180 min |
Participantsdifferent | 1-10 | 3-6 |
Formatsame | Workshop | Workshop |
Outputdifferent | Sketch Set, Idea Shortlist, Direction Options | GQM Table, Metric Profiles |
Tagsno overlap | BrainstormingSketchingSpeedDivergenceDesign sprint | MetricsMeasurementEngineeringAlignment |
Often compared together
Methods with strong topical overlap with the current selection, not yet in the comparison.





