View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Innovation Crazy 8s | ![]() Systems Thinking Future Reality Tree | ![]() Systems Thinking Evaporating Cloud | ![]() Innovation Brainstorming |
|---|---|---|---|---|
Purposedifferent | With only a few minutes available and a still-fuzzy solution search, the method forces a wide range of variants. It produces fast sketches before the first idea can settle in, making different directions directly comparable and open to further development. | A Future Reality Tree shows how desired actions are meant to lead to a better system state. The method checks whether a path of change holds together logically before time flows into implementation. | The method makes visible why two seemingly incompatible demands arise and which assumption must be tested to resolve the conflict. | When a team faces an open question with many obvious directions, the method first creates breadth instead of premature commitment. It separates idea flow from evaluation and makes lines of thought visible, creating a pool for selection and further development. |
Complexitydifferent | Low | High | Medium | Low |
Timedifferent | 8-15 min | 2-4 h | 60-120 min | 30-60 min |
Participantsdifferent | 1-10 | 3-8 | 2-8 | 4-12 |
Formatsame | Workshop | Workshop | Workshop | Workshop |
Outputdifferent | Sketch Set, Idea Shortlist, Direction Options | Future Reality Tree, Negative Branches, Assumption List, Improved Injections | Conflict Cloud, Assumption List, Breakthrough Ideas, Next Experiments | Idea pool, Theme clusters, Shortlist |
Tagsno overlap | BrainstormingSketchingSpeedDivergenceDesign sprint | Theory of ConstraintsSystems thinkingChange | Theory of ConstraintsAssumptionsSystems thinking | BrainstormingIdeationCreativityWorkshopDivergence |



