View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Innovation Crazy 8s | ![]() Growth A/B Testing | ![]() Innovation Brainstorming | ![]() Innovation Lotus Blossom |
|---|---|---|---|---|
Purposedifferent | With only a few minutes available and a still-fuzzy solution search, the method forces a wide range of variants. It produces fast sketches before the first idea can settle in, making different directions directly comparable and open to further development. | When two variants compete, discussions quickly decide by taste rather than effect. A/B Testing checks behavior under controlled conditions and separates real improvement from chance or expectation effects. | When a team faces an open question with many obvious directions, the method first creates breadth instead of premature commitment. It separates idea flow from evaluation and makes lines of thought visible, creating a pool for selection and further development. | When a central question feels too large, the method breaks it into neighboring topic fields with their own depth of ideation. It holds structure and openness at the same time, so adjacent perspectives don't get lost. This grows an idea space out of a core problem. |
Complexitydifferent | Low | High | Low | Low |
Timedifferent | 8-15 min | 1-4 Wochen | 30-60 min | 45-90 min |
Participantsdifferent | 1-10 | 1-6 | 4-12 | 3-10 |
Formatdifferent | Workshop | Async | Workshop | Workshop |
Outputdifferent | Sketch Set, Idea Shortlist, Direction Options | Experiment results, Decision log, Learning summary | Idea pool, Theme clusters, Shortlist | Lotus Diagram, Idea Themes, Shortlist |
Tagsno overlap | BrainstormingSketchingSpeedDivergenceDesign sprint | ExperimentsGrowthAnalyticsValidation | BrainstormingIdeationCreativityWorkshopDivergence | BrainstormingIdeationCreativityDivergenceWorkshop |



