View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Innovation Crazy 8s | ![]() Operations 8D Problem Solving | ![]() Innovation Rapid Ideation | ![]() Innovation Lotus Blossom |
|---|---|---|---|---|
Purposedifferent | With only a few minutes available and a still-fuzzy solution search, the method forces a wide range of variants. It produces fast sketches before the first idea can settle in, making different directions directly comparable and open to further development. | For an acute quality or delivery problem, the method structures immediate protection and root cause work together. It keeps the situation stable while the actual cause is investigated cleanly. | When a decision needs to be prepared quickly, the method generates many solution-close variants in a short time. It deliberately relies on pace to undercut self-censorship and perfectionism. This quickly produces a usable field for prioritization and further work. | When a central question feels too large, the method breaks it into neighboring topic fields with their own depth of ideation. It holds structure and openness at the same time, so adjacent perspectives don't get lost. This grows an idea space out of a core problem. |
Complexitydifferent | Low | High | Low | Low |
Timedifferent | 8-15 min | 1-6 Wochen | 5-20 min | 45-90 min |
Participantsdifferent | 1-10 | 4-10 | 1-20 | 3-10 |
Formatdifferent | Workshop | Workshop + async | Workshop + async | Workshop |
Outputdifferent | Sketch Set, Idea Shortlist, Direction Options | 8D Report, Containment Plan, Root Cause Evidence, Corrective Action Plan | Ideenpool, Roh-Shortlist, Cluster | Lotus Diagram, Idea Themes, Shortlist |
Tagsno overlap | BrainstormingSketchingSpeedDivergenceDesign sprint | QualityProblem solvingRoot cause | BrainstormingIdeationDivergenceSpeed | BrainstormingIdeationCreativityDivergenceWorkshop |



