methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay
A paper-based illustration representing WSJF with its core stages and visible working result.
Agile
WSJF
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Value Stream Mapping workspace showing the question, observations, and next decision.
Delivery
Value Stream Mapping
Purposedifferent
Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence.When many tasks compete for the same capacity, it orders work by economic impact. It makes time lost, benefit, and effort comparable together.When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.When delivery work dissolves into wait times, handoffs, and hidden effort, Value Stream Mapping makes the actual flow visible. The method exposes bottlenecks, idle time, and feedback loops so lead time and improvement levers become tangible.
Complexitydifferent
HighHighMediumMedium
Timedifferent
90-180 min45-90 minOngoing1-3 h
Participantsdifferent
3-83-102-124-10
Formatdifferent
WorkshopWorkshopWorkshop + asyncWorkshop
Outputdifferent
CoD Table, Prioritization SequenceRanked Backlog, Cost-of-Delay AssumptionsKanban board, WIP policies, Flow metricsCurrent-state map, Future-state map, Bottleneck list
Tagsno overlap
PrioritizationDeliveryEconomicsDecision
LeanEconomicsSequencePrioritization
FlowVisual managementDelivery
LeanFlowWasteDelivery
Add more methods