View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay
Paper illustration of a calibrated five-by-five risk matrix with response cards.
Decision Making
Risk Matrix
Paper illustration for Dot Estimation.
Facilitation
Dot Estimation
Paper illustration of an assumption matrix with prioritized test cards
Decision Making
Assumption Surfacing
Purposedifferent
Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence.When a project faces many possible disruptions, it quickly becomes unclear which risks deserve attention first. It separates options, evaluation criteria, and open risks. The result is captured as a Risk Matrix and a Top Risk List.When size or effort can only be estimated roughly, Dot Estimation condenses the group's experience into a quick range. It turns individual contributions into a visible selection. The result is captured as an Effort Heatmap, Risk Signals, and Discussion Targets.Plans often contain assumptions that were never openly stated and remain dangerous precisely because of that. Assumption Surfacing makes these silent premises visible and prioritizes which of them carry the initiative or could sink it.
Complexitydifferent
HighLowLowLow
Timedifferent
90-180 min30-60 min5-20 min45-90 min
Participantsdifferent
3-83-103-202-8
Formatdifferent
WorkshopWorkshop + asyncWorkshopWorkshop + async
Outputdifferent
CoD Table, Prioritization SequenceRisk Matrix, Top Risk ListEffort Heatmap, Risk Signals, Discussion TargetsAssumption List, Critical Assumptions, Learning Plan
Tagsno overlap
PrioritizationDeliveryEconomicsDecision
RiskDecisionPrioritizationAssessment
EstimationEffortRisk
AssumptionsRiskDecisionDiscovery