Criterion
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay
Paper illustration of a calibrated five-by-five risk matrix with response cards.
Decision Making
Risk Matrix
Paper illustration for 8D Problem Solving.
Operations
8D Problem Solving
Paper illustration for Kepner-Tregoe
Operations
Kepner-Tregoe
Purposedifferent
Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence.When a project faces many possible disruptions, it quickly becomes unclear which risks deserve attention first. It separates options, evaluation criteria, and open risks. The result is captured as a Risk Matrix and a Top Risk List.For an acute quality or delivery problem, the method structures immediate protection and root cause work together. It keeps the situation stable while the actual cause is investigated cleanly.For a disturbance that's hard to pin down, the method cleanly separates problem, cause, and decision. It reduces mixing when symptoms allow several interpretations.
Complexitydifferent
HighLowHighHigh
Timedifferent
90-180 min30-60 min1-6 Wochen2-8 h
Participantsdifferent
3-83-104-102-8
Formatdifferent
WorkshopWorkshop + asyncWorkshop + asyncWorkshop + async
Outputdifferent
CoD Table, Prioritization SequenceRisk Matrix, Top Risk List8D Report, Containment Plan, Root Cause Evidence, Corrective Action PlanProblem Analysis, Decision Analysis, Risk Plan
Tagsno overlap
PrioritizationDeliveryEconomicsDecision
RiskDecisionPrioritizationAssessment
QualityProblem solvingRoot cause
Problem solvingRoot causeDecisionOperations