methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay
A hypothetical failure makes concrete risks, signals, and fitting mitigations visible.
Decision Making
Pre-Mortem
Paper illustration for Failure Scenario Analysis.
Engineering
Failure Scenario Analysis
Paper illustration of a calibrated five-by-five risk matrix with response cards.
Decision Making
Risk Matrix
Purposedifferent
Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence.In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures.In critical processes, it is not enough to plan only for the normal case. Failure Scenario Analysis looks at the path into failure and shows which failures, chains, and control gaps cause the most damage.When a project faces many possible disruptions, it quickly becomes unclear which risks deserve attention first. It separates options, evaluation criteria, and open risks. The result is captured as a Risk Matrix and a Top Risk List.
Complexitydifferent
HighLowMediumLow
Timedifferent
90-180 min20–45 min1-3 h30-60 min
Participantsdifferent
3-8Small cross-functional group3-83-10
Formatdifferent
WorkshopWorkshopWorkshopWorkshop + async
Outputdifferent
CoD Table, Prioritization SequenceRisk list, Mitigation plan, Assumption logFailure Scenarios, Risk Notes, Control Gaps, Test and Response ActionsRisk Matrix, Top Risk List
Tagsno overlap
PrioritizationDeliveryEconomicsDecision
RiskDecisionFailurePlanning
FailureResilienceRisk
RiskDecisionPrioritizationAssessment
Add more methods