View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Delivery Cost of Delay | ![]() Operations Kepner-Tregoe | ![]() Facilitation Decision Jam | ![]() Operations 8D Problem Solving |
|---|---|---|---|---|
Purposedifferent | Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence. | For a disturbance that's hard to pin down, the method cleanly separates problem, cause, and decision. It reduces mixing when symptoms allow several interpretations. | When a decision is stuck, Decision Jam loosens the knot through structured separation of problem, idea, and selection. The format creates movement without jumping prematurely at the first seemingly elegant answer. | For an acute quality or delivery problem, the method structures immediate protection and root cause work together. It keeps the situation stable while the actual cause is investigated cleanly. |
Complexitydifferent | High | High | Low | High |
Timedifferent | 90-180 min | 2-8 h | 60-90 min | 1-6 Wochen |
Participantsdifferent | 3-8 | 2-8 | 4-10 | 4-10 |
Formatdifferent | Workshop | Workshop + async | Workshop | Workshop + async |
Outputdifferent | CoD Table, Prioritization Sequence | Problem Analysis, Decision Analysis, Risk Plan | Problem Cluster, Prioritized Challenge, Experiment | 8D Report, Containment Plan, Root Cause Evidence, Corrective Action Plan |
Tagsno overlap | PrioritizationDeliveryEconomicsDecision | Problem solvingRoot causeDecisionOperations | FacilitationDecisionProblem solvingWorkshop | QualityProblem solvingRoot cause |



