methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay
Paper illustration of an IBIS map with issues, positions and arguments
Knowledge Modeling
IBIS
A paper-based illustration representing WSJF with its core stages and visible working result.
Agile
WSJF
Paper illustration of a calibrated five-by-five risk matrix with response cards.
Decision Making
Risk Matrix
Purposedifferent
Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence.IBIS structures thinking about complex questions as a sequence of issues, ideas, and arguments. The method keeps discussions open without forcing them into premature consensus.When many tasks compete for the same capacity, it orders work by economic impact. It makes time lost, benefit, and effort comparable together.When a project faces many possible disruptions, it quickly becomes unclear which risks deserve attention first. It separates options, evaluation criteria, and open risks. The result is captured as a Risk Matrix and a Top Risk List.
Complexitydifferent
HighMediumHighLow
Timedifferent
90-180 min1-3 h45-90 min30-60 min
Participantsdifferent
3-82-83-103-10
Formatdifferent
WorkshopWorkshop + asyncWorkshopWorkshop + async
Outputdifferent
CoD Table, Prioritization SequenceIssue Map, Positions, Argument NotesRanked Backlog, Cost-of-Delay AssumptionsRisk Matrix, Top Risk List
Tagsno overlap
PrioritizationDeliveryEconomicsDecision
RationaleKnowledgeDecision
LeanEconomicsSequencePrioritization
RiskDecisionPrioritizationAssessment
Add more methods