View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Delivery Cost of Delay | ![]() Engineering Failure Scenario Analysis | ![]() Decision Making Assumption Surfacing | ![]() Decision Making Pre-Mortem |
|---|---|---|---|---|
Purposedifferent | Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence. | In critical processes, it is not enough to plan only for the normal case. Failure Scenario Analysis looks at the path into failure and shows which failures, chains, and control gaps cause the most damage. | Plans often contain assumptions that were never openly stated and remain dangerous precisely because of that. Assumption Surfacing makes these silent premises visible and prioritizes which of them carry the initiative or could sink it. | In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures. |
Complexitydifferent | High | Medium | Low | Low |
Timedifferent | 90-180 min | 1-3 h | 45-90 min | 20–45 min |
Participantsdifferent | 3-8 | 3-8 | 2-8 | Small cross-functional group |
Formatdifferent | Workshop | Workshop | Workshop + async | Workshop |
Outputdifferent | CoD Table, Prioritization Sequence | Failure Scenarios, Risk Notes, Control Gaps, Test and Response Actions | Assumption List, Critical Assumptions, Learning Plan | Risk list, Mitigation plan, Assumption log |
Tagsno overlap | PrioritizationDeliveryEconomicsDecision | FailureResilienceRisk | AssumptionsRiskDecisionDiscovery | RiskDecisionFailurePlanning |



