methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay
Paper illustration for Failure Scenario Analysis.
Engineering
Failure Scenario Analysis
Paper illustration of a calm four-quadrant Assumption Map with hypothesis cards and emphasis on important assumptions with little evidence.
Product Discovery
Assumption Mapping
A hypothetical failure makes concrete risks, signals, and fitting mitigations visible.
Decision Making
Pre-Mortem
Purposedifferent
Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence.In critical processes, it is not enough to plan only for the normal case. Failure Scenario Analysis looks at the path into failure and shows which failures, chains, and control gaps cause the most damage.When assumptions still sit unordered in the room, it weighs uncertainty against leverage. It makes visible which hypotheses should be checked first.In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures.
Complexitydifferent
HighMediumMediumLow
Timedifferent
90-180 min1-3 h45-60 min20–45 min
Participantsdifferent
3-83-82-8Small cross-functional group
Formatdifferent
WorkshopWorkshopWorkshop + asyncWorkshop
Outputdifferent
CoD Table, Prioritization SequenceFailure Scenarios, Risk Notes, Control Gaps, Test and Response ActionsAssumption map, Test backlog, Risk rankingRisk list, Mitigation plan, Assumption log
Tagsno overlap
PrioritizationDeliveryEconomicsDecision
FailureResilienceRisk
AssumptionsRiskExperimentsValidation
RiskDecisionFailurePlanning
Add more methods