methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay
Paper illustration of an assumption matrix with prioritized test cards
Decision Making
Assumption Surfacing
Software Architecture Canvas method illustration showing its working structure
Architecture
Software Architecture Canvas
Paper illustration of a calibrated five-by-five risk matrix with response cards.
Decision Making
Risk Matrix
Purposedifferent
Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence.Plans often contain assumptions that were never openly stated and remain dangerous precisely because of that. Assumption Surfacing makes these silent premises visible and prioritizes which of them carry the initiative or could sink it.The Software Architecture Canvas reduces a system to the most important architecture decisions, constraints, and interfaces. It is useful when teams need a resilient overall picture quickly.When a project faces many possible disruptions, it quickly becomes unclear which risks deserve attention first. It separates options, evaluation criteria, and open risks. The result is captured as a Risk Matrix and a Top Risk List.
Complexitydifferent
HighLowLowLow
Timedifferent
90-180 min45-90 min1-2 h30-60 min
Participantsdifferent
3-82-83-103-10
Formatdifferent
WorkshopWorkshop + asyncWorkshopWorkshop + async
Outputdifferent
CoD Table, Prioritization SequenceAssumption List, Critical Assumptions, Learning PlanArchitecture Canvas, Goals, Constraints, Quality AttributesRisk Matrix, Top Risk List
Tagsno overlap
PrioritizationDeliveryEconomicsDecision
AssumptionsRiskDecisionDiscovery
CanvasArchitectureAlignmentWorkshop
RiskDecisionPrioritizationAssessment
Add more methods